Just-In-Time (JIT)

Producing only what's needed, when it's needed, in the amount needed, to avoid waste from overproduction and waiting.

2 min read · Practitioner

In 30 seconds

  • Make only what's needed, just when it's needed.
  • Pull work based on demand, not push based on forecasts.
  • A pillar of the Toyota Production System.

Origins

Taiichi Ohno developed just-in-time at Toyota as one of the two pillars of the Toyota Production System, alongside jidoka. Kanban cards signalled when to produce more parts.

Pull, not push

In a pull system, downstream steps signal when they need more work. Nothing is produced to sit in inventory. In software, a Kanban board with WIP limits creates pull.

JIT in agile

  • Refine backlog items just before they're needed
  • Detailed planning only for the next sprint
  • Decide at the last responsible moment

See rolling wave planning.

Myth vs reality

Myth · JIT means no inventory at all.
Reality · It means minimal, purposeful inventory.
Myth · JIT is fragile.
Reality · It needs stable flow; buffers can be planned.
Myth · It only applies to manufacturing.
Reality · Agile planning applies JIT to information.

FAQ

What's the link to Kanban?

Kanban cards were the original JIT signal.

Can JIT backfire?

Yes, if supply is unreliable; that's why flow stability matters.

What's just-in-time requirements?

Detailing requirements only when they're about to be built.